jQuery Mobile Framework
Search Home >> Standards Wordwide >> Cenelec Electronic Components Committee (CECC) >> CECC 299 001-1999 Technology Approval Schedule - Manufacture of Electrical Connectors

CECC 299 001-1999 Technology Approval Schedule - Manufacture of Electrical Connectors

Standard Number:  CECC 299 001-1999
Title:  Technology Approval Schedule - Manufacture of Electrical Connectors
Language:  English
Publication Date:  1999/4/1
Adopted International Standard:  BS CECC 299 001-1999 (Duplicate Record) Identical

Status:  Current
International Classification for Standards (ICS)ELECTRICAL ENGINEERING>>Electrical accessories>>Connecting devices
Publisher:  Cenelec Electronic Components Committee (CECC)
Price:  
Number of Pages:22  

Description:Defines the definitions, terms, quality systems, test, symbols, assessment and verification methods and other requirements relevant to manufacture, design and supply of Electrical Connectors, to conform with general requirements of CECC system for electronic components of assessed quality.  
Catalog:Introduction
1 General
1.1 Scope
1.2 Related Documents
1.3 Units, Symbols and Technology
1.4 Standard and Preferred Values
1.5 Definitions
2 Definition of the Component Technology
2.1 Scope
2.2 Description of Activities and Flow Charts
2.3 Technology Abstract
3 Component Design
3.1 Scope
3.2 Description of Activities and Flow Charts
3.3 Interrelationships
3.3.1 Design Manufacture
3.3.2 Customer/User
3.3.3 Subcontractors, Vendors and Internal
Suppliers
4 Piece-Part Manufacture
4.1 Scope
4.2 Description of Activities and Flow Charts
4.3 Materials, Inspection and Handling
4.4 Equipment
4.5 Rework
4.6 Validation and Control of the Process(es)
4.7 Subcontracting
5 Assembly
5.1 Scope
5.2 Description of Activities and Flow Charts
5.3 Materials, Inspection and Handling
5.4 Equipment
5.5 Rework
5.6 Validation and Control of the Process(es)
5.7 Subcontracting
6 Testing
6.1 Scope
6.2 Description of Activities and Flow Charts
6.3 Equipment
6.4 Test Procedures
6.5 Interrelationships
6.5.1 Subcontracting
6.5.2 Verification of Customer Specification
7 Verification and Test Vehicles
7.1 Process Boundary Verification
7.2 Product Verification
8 Process Characterisation
8.1 Identification of Process Characteristics
8.2 Description of Activities and Flow Charts
9 Primary Packaging and Shipment
9.1 Description of Activities and Flow Charts
9.2 Interrelationships
9.2.1 Verification of Customer Requirements
9.2.2 Subcontracting
9.3 Validity of Release
10 Withdrawal of Technology Approval
Figure 1 - Example Flow Chart - Design/Manufacture/Test
Figure 2 - Example Flow Chart - Design
Figure 3 - Example Flow Chart - Piece-Part Manufacture
Figure 4 - Example Flow Chart - Connector Assembly
Figure 5 - Example Flow Chart - Testing of Connectors
Annex A - Example Abstract of Technology Approval  
File Format:  PDF(Acrobat Reader) or Word version doc Document
File Size:  928KB
Tile in English:  Technology Approval Schedule - Manufacture of Electrical Connectors

Full Text Information

Related

Top 10

New 10

PC Version